Pool Construction Started

 

Construction of our pool started Tuesday (June 7). The crew from Pool Perfections was on-time and it wasn’t long before the little Bobcat had removed what was once a nice-looking lawn.

Prior to this, John and the landscaping crew had removed pavers, furniture, a fountain, and most importantly a gas and water line. It took only 4-5 hours to move the pavers, but all felt the effects in the days that followed. Luckily our plumber wanted them, and they are forever gone.

Bobcat hard a work

It took three days to dig the hole. The depth of the pool will start a 3.6’ (110 cm) and will be 7’  (215 cm) at the deepest end. We’ll have a hot tub on the shallow end, and a platform for easy steps into the pool.

Work also started on the gas line from the main to where the equipment and all-in-all our grounds are beaten-up resembling nothing like it was just 10 days ago.

The builders didn’t strike oil or gold while excavating. Only a small waterline, an already-disconnected gas line, and the drain line for our downspouts set strangely far from the house.