The last two weeks have been primarily tile work. At this point, probably 65% is covered. The crew was supposed to wrap this coming week, but we doubt they’ll make it in time.
The pool equipment was installed Friday. It’s not taking up much space but is not particularly pretty to look at. So we’re looking for someone that can build an enclosure for it.
This week is the last week that the pool will be without water. The plaster will go in Tuesday, and the water will start flowing and soon as it’s a little dry. The water can’t stop once we start, so we’re hoping there are 30,000 gallons available to us. It rained this weekend, so we feel pretty good about it.
This past week we met with Sarah – a landscape architect who will help us pick flowers, bushes, and trees. We are excited to see initial plans this coming Wednesday.

